NEW CONSTRUCTION

  • Infill courtyard next to the media cneter to create indoor collaboration space

SITE WORK

  • Replace concrete sidewalks

  • Improve driveway traffic flow

  • Upgrade front entry

  • Renovate baseball and softball fields (fencing, dugouts, backstops)

  • Update landscaping

MECHANICAL WORK

  • Replace fixtures in restrooms

  • Replace art room sinks

  • Install water bottle fill stations

  • Replace mechanical systems (7)

  • Improve food distribution

  • Remove dishwasher

  • Upgrade temperature control system

ELECTRICAL WORK

  • Upgrade switchgear

  • Ugrade interior lighting by adding occupancy sensors

  • Replace house lighting in the auditorium

  • Replace specialy lighting in the auditorium

  • Upgrade fire alarm

FURNISHINGS, FURNITURE AND EQUIPMENT

  • Purchase classroom furniture

  • Purchase collaborative space furniture

  • Purchase furniture for new student collaboration space and board meetings

  • Purchase furnishings

  • Purchase STEM/CTE equipment

  • Purchase musical instruments

  • Purchase athletic equipment

  • Replace kitchen equipment

  • Purchase custodial equipment

ARCHITECTURAL WORK

  • Create secure entry at the main entry

  • Create a secure entry for the alternative education program

  • Abate asbestos/hazardous materials for renovations

  • Replace interior doors and hardware

  • Remove showcase in the cafeteria

  • Remove display and rolling door in the video area

  • Remove wall to open ceramics space

  • Add casework/storage for classrooms

  • Add specialy casework--band, vocal music storage, video production

  • Replace exterior doors and hardware on the entry doors

  • Upgrade hardware only for safety and code compliance

  • Replace ceilings

  • Install accoustical panels for gym and band

  • Replace chalkboards with markerboards

  • Renovate main restrooms in north end and southwest hallway

  • Renovate single restrooms

  • Update teachers' lounge

  • Improve food distribution--add a serving line

  • Renovate alternative ed wing

  • Update eating commons

  • Update main office space

  • Renovate open locker areas

  • Renovate media center

  • Renovate science rooms

  • Renovate robotics, fitness, wrestling spaces for STEM use

  • Renovations for courtyard infill

  • Replace classroom flooring

  • Install epoxy floor in locker rooms

TECHNOLOGY SAFETY AND SECURITY

  • Replace and expand security cameras

  • Expand access control system

  • Replace entrance intercoms

  • Install emergency alert system

  • Replace the public address system

TECHNOLOGY EQUIPMENT

  • Replace teacher and staff computers

  • Replace student computers

  • Replace and expand mobile devices

  • Replace projectors with interactive displays

  • Replace classroom sound systems

  • Purchase document cameras

  • Purchase technology for collaboration spaces

  • Replace admin staff computers

  • Replace printers

  • Replace copiers

TECHNOLOGY INFRASTRUCTURE

  • Replace network and wireless infrastructure

  • Replace phone system

  • Replace sound system

  • Replace clock system

AUDIO/VISUAL

  • Purchase interactive displays

  • Purchase adjustable height displays

  • Purchase display module

  • Remove existing interactive white boards

  • Remove existing TVs

  • Replace classroom sound systems

  • Purchase document cameras

  • Purchase audio/visual for collaboration spaces

  • Purchase digital signage displays

  • Replace board room audio/visual

Parking Lot Updates on Main Campus

Map of Silver Lake Road Campus with COMPLETED stamp on top of image.

  • Parent and bus drop @ LHS

  • Parking lot redo @ LHS

  • Parking lot entrance @ Central

  • Parent dropoff @ Central

  • Student parking lot @ LHS

  • Access drive moved

  • MPC parking lot added

  • Pathway moved

  • Bus gate at south end